90. Preparation of Engineering Projects of Çamlıkaya City Road Relocation at Arkun Dam and HEPP İspir-Yusufeli Section

-Preparation of Çamlıkaya Bridge Projects (L=137 m, 6 spans)

-Preparation of Ch. 23+524 Culvert Projects (L=84.82 m, 2@5x5m)

-Preparation of Ch. 31+838 Culvert Projects (L=76.52 m, 2@4x4m)

General Directorate of Highways 12'th Division Directorate

Project Year: