131. Construction Work of Steel and Reinforced Concrete Bridges over the Seyhan River, which will provide the connection of Adana, Çukurova,Sarıçam and Yüreğir Districts,and the Road and Junction Construction Work
Project Details
-Preparation of Roadway Projects (2km)
-Bridge Project with Steel box section (L=875m, max span:105m.) and Post tension section (L=825m, max span:63m.)