87. Preparation of Ankara-Kırıkkale Highway, Kırıkkale-Kayseri Junction Bridges Final Design Project

-Final Projects of Underpass Bridge and Approach Walls

-Final Projects of Bridge-1 Overpass Bridge (Total Length = 114m, 5 spans, Precast Prestressed Concrete Beam Superstructure System)

-Final Projects of Bridge-2 Overpass Bridge (Total Length = 168m, 3 Spans, Steel Orthotropic Box Section Superstructure System)

General Directorate of Highways 4'th Division Directorate

Project Year: