66. Preparation of Engineering Projects of Culvert and Bridge at Çobandede-Hınıs-Varto State Highway CH:0+000-148+000

-Preparation of reinforced concrete culvert (7mx5m) projects between KM: 1+043.63 - 1+051.947

-Preparation of Church River Bridge projects ( L=23.50 m, one span)

-Preparation of Church River Bridge projects ( L=36.0 m, two spans)

General Directorate of Highways 12'th Division Directorate

Project Year: