128. Preparation of Final Projects of Engineering Structures at Eruh-Fındık (Bağgöze Junction) Connection Road Project

-Final Projects of Kures Bridge (Total Length = 22m, 1 span R/C Bridge)
-Final Projects of Inlı River Bridge (Total Length = 118m, 5 Spans, R/C Bridge)
-Final Projects of Gerger Bridge (Total Length = 70m, 3 Spans, R/C Bridge)

General Directorate of Highways 9’th Division Directorate

Project Year: