13. Preparation of the Construction and Electro-mechanical Works of Otogar-Bağcılar Railed Public Transportation Systems; Preparation of the Final Design Project of the İkitelli Sanayi 2 and Kirazlı Stations

Preparation of Final Design Projects of the Ikitelli Sanayi 2 Station (station with 15000m2 cut&cover method)

Preparation of Final Design Projects of the Kirazlı Station (station with diaphragm wall and 27000m2 space built with top-down method)

Istanbul Metropolitan Municipality IETT General Directorate

Project Year: